Shahnehar Project

The original A/A & E/S of the Project has been accorded vide FC cum Secy. IPH letter No. IPH15-85 Vol. -II dated 2nd June 1997 for the cost of Rs. 143.90 Crores. The revised A/A & E/S of the project has also been accorded amounting to Rs. 310.89 Crores and Re-revised A/A & E/S of the project has also been accorded vide Secy. IPH No IPH – B ( F)2-3/2004-III Dated Shimla – 31.03.2012 for Rs. 387.17 Crore. The Project has been completed with a completion cost of Rs. 387.22 Crore and Project Completion Report also stands submitted during 09/2013. This project has directly benefited the farmers of 93 villages of two number constituencies i.e. Fatehpur and Indora Tehsil Distt. Kangra. It has raised their living standard by transforming their barren land into green belt. The canal serves as a life line for its beneficiaries.

Salient Features


Total CCA 15287 Hect.
i) RBC 9104 Hect.
ii) LBC 6183 Hect.
Location of off-take points RBC Shah Nehar Barrage
LBC Mukerian Hydel Channel
Water requirement RBC 6.48 cumecs
LBC 3.82 cumecs
Length of main canal
i) Right Bank Canal
ii) Left Bank Canal

45.305 km
26.009 km
Distributory 33.695 km (4 No.)
Minor 77.367 km (23 No.)
Sub Minor 62.386 km (23 No.)
Water Courses 157.843 km
Lift Irrigation Schemes
(including T/wells)
46 No. Tubewells (22 No. RBC, 24 No. LBC)
Design Consisting open channel, tunnel, RCC
Box, (Trough section, cut & cover
section), Aqueducts etc.
Cost per hectare of CCA Rs. 253300/-
Benefit Cost (BC) Ratio 1.64 : 1